Quality & testing

Quality defined before it is measured.

We connect requirements, engineering decisions and project-specific validation — so “acceptable” means the same thing to you and to us.

Working approach

Define what “acceptable” means before release.

Quality planning starts with the product requirements and the acceptance criteria we agree with you.

A precision part, a control module and a completed mechanical-electronic assembly don’t need the same checks. Mechanical interfaces, electronic behaviour, documentation and final-product checks are planned in relation to one another.

Framework

A project-specific quality framework.

01

Requirement review

Identify dimensions, functions, interfaces, operating conditions and acceptance criteria.

02

Engineering controls

Record design decisions and critical interfaces so changes are assessed against the requirement.

03

Prototype checks

Examine the physical and functional result against agreed prototype objectives.

04

Validation planning

Define the checks, samples, conditions and records appropriate to the application.

05

Final-product review

Confirm agreed completion and release checks before delivery.

06

Traceable decisions

Keep the link between requirement, design change and verification visible.

What you should provide

Drawings and functional requirements are a good start. Also tell us the operating conditions, acceptance limits, required records and any industry or destination-market requirements.

What we will agree with you

Test methods, sample basis, records and witness options are defined for your project and set out in the engineering proposal — specific to the product, never generic.

Let’s define acceptance criteria together with the requirement.